Methodology
How Courtside Pro builds, scores, and surfaces hardwood maple sports floor intelligence. Updated .
Documented product use
Courtside Pro separates recorded product use from contractor opinions. A confirmed catalog link documents a product recorded on a job. It does not establish measured application results, durability, or product quality.
- Own-company job totals require complete, verified job and product-link reads. A product recorded more than once on one job counts as one job. An unavailable history is not zero use.
- A displayed job date is the recorded job date, not a verified application or cure timestamp.
- Pail labels and raw lot values, when captured, stay attached to their exact product-use record. Several pails or lots may belong to one job. A missing lot is not a match.
- Historical contractor comments and their original ratings remain visible as opinions. A historical rating of 3 may mean no opinion; it is not evidence of average performance. These ratings do not create a product score or ranking.
- Application and later performance are not assessed here. Crews can record whether the gym air was off during coating, and floor marks at later visits; linking those later visits to a product or lot is not built yet. Unknown and not assessed results do not count as average or successful results.
- Product-level issue reports are not automatically linked to a specific application and do not establish a product failure rate.
Product performance scores and numerical review collection are retired from these product views. Future documented observations require a specific product-use record, stage, observation time, source, assessment state, and any applicable lot evidence before they can support an outcome summary.
Floor Life Index (FLI)
- The 62 / 80-year lifespan caps by thickness are Courtside internal planning assumptions, not MFMA or NWFA maximums. MFMA's public pages describe longer lives: typically over 75 years for a well-maintained 25/32" floor, and over 100 years is not uncommon for 33/32" (see Sources).
- The only publisher figures the model uses are MFMA's up to six sandings for 25/32" maple and its limit of no more than 1/32" removed per sanding.
- Deterministic calculation from thickness, sanding history, and environmental factors
- Two-population lifecycle model remains a deterministic research visualization, not a live fleet forecast.
FLI returns remaining-years estimates and a maintenance trajectory. The two-population model assumes that most maple floors are replaced for non-wear reasons (water, demolition, deferred maintenance) long before they wear out. MFMA states that "less than one percent of replacement floors are necessitated by depleted wear surface" (MFMA Open Letter, checked September 28, 2026); MFMA publishes no sample or method for that statistic, so the page treats it as MFMA's stated position.
Floor Intelligence model (floor-intel-v4q-20261021)
The Floor Health Score and Floor Life Index share one versioned model. Worked examples are generated from the same scorer the app runs, and automated checks fail if any scoring constant changes without a new model version. Browse the dated research behind the figures in Research & guides.
Inputs & defaults
| Input | Default | Required |
|---|---|---|
| Year installed | — | Yes (without it the floor is incomplete) |
| Times sanded | Not recorded (counted as 0 in the score) | No |
| Thickness | 25/32" | No |
| Multi-use | false | No |
| Has cover | not recorded: kept for the record only. The model does not read it, so a cover never changes the sand interval or the score, and a missing cover is never a deduction or a risk | No |
| HVAC year-round | true | No |
| Measured thickness | — | No (25/32" only) |
| Year last sanded | unknown | No |
| Job history | [] | No |
Branches
- Thickness: 33/32" → max 10 sandings, 80-year lifespan cap (both internal planning assumptions); 25/32" → max 6 sandings (MFMA guidance, conditional on proper maintenance and skilled sanding), 62-year lifespan cap (internal planning assumption).
- Usage sand interval (internal planning assumption): multi-use = 8 yr; every other floor = 10 yr. Whether the floor has a cover does not change the interval. The values sit inside MFMA's 8–12-year sanding example; the mapping to use level is Courtside's.
- Year-precision dates: legacy January 1 records anchor to July 1; recoat-overdue deduction capped at 15 points.
- Measured thickness (25/32" only): remaining sandings from a 0.578" minimum serviceable thickness (internal planning assumption derived from secondary research on NWFA wear-layer geometry; NWFA's guidelines are member publications and were not verified) and 0.03125" (1/32") removal per sand (MFMA: subsequent sandings should remove no more than 1/32").
- Unknown sand/service history: missing history is unknown evidence — overdue tiers apply only when a date is recorded. A floor with no sand on record is never counted as sand-due, and its next sand is shown as unknown rather than left blank or estimated.
- Floor covers (models
floor-intel-v4o-20261012andfloor-intel-v4p-20261013): a missing floor cover is not a health-score deduction and not a risk, and a floor cover does not change the sanding plan either. MFMA's Floor Surface Protection position statement treats covers as optional extra protection for multipurpose rooms used for non-athletic events and does not say covers lengthen sanding or recoat intervals, and a school's cover use is hard to know, so the score and the sanding plan follow that position. Beforefloor-intel-v4o-20261012a multi-use floor recorded with no cover lost 8 points and showed a high risk; beforefloor-intel-v4p-20261013a multi-use floor recorded with a cover planned a 9-year sand cycle, one recorded with no cover planned 8 years, and one with the cover left blank planned 10. The cover field is kept as a record only. MFMA's cautions are unchanged: confirm the finish manufacturer's full cure time before covering, and limit how long a cover stays down so the maple can equalize. - Year last sanded without a recoat year (model
floor-intel-v4k-20260928): a year entered for the last sanding is evidence of that sanding only. It drives the sand-cycle tiers, but it is not evidence that nothing was done since, so it does not start the recoat-freshness clock; last service stays a missing input, confidence stays below high, and a planning range is shown. A recoat year or a crew-logged job restores the recoat tiers. A projected next-sand year already in the past is shown as overdue, never as a projection. - Unknown sanding count (model
floor-intel-v4q-20261021): a floor whose past sandings were never entered is stored as not recorded, not as zero. The health score, phase, next sand and deductions count it exactly as before (as no past sandings), so an unknown count never lowers the score or moves the sand date. Only the remaining-life planning range and its wording change: the low end is the low end of the same floor sanded on its usual cycle since it was installed (at least one sanding when a sanding job is on record), and the high end still counts it as never sanded. A thickness measurement on a 25/32" floor replaces the assumption. Separately, no planning range runs past the lifespan cap (62 or 80 years).
Deductions & caps
| Tier | Points | Cap / notes |
|---|---|---|
| Recoat overdue (>1 yr, exact date) | −30 | Year-precision cap −15 |
| Recoat due (>9 mo) | −15 | — |
| Recoat approaching (>6 mo) | −5 | — |
| Sand cycle overdue | −20 | Requires recorded sand date |
| Sand cycle due soon | −12 | — |
| Sand cycle approaching | −5 | — |
| No / 1 / 2 sandings remaining | −15 / −10 / −5 | Counted at the conservative bound (4 total on 25/32") |
| HVAC not year-round | −12 | — |
| Tape damage history | −5 | — |
| Floor age >40 yr (25/32") | −3 | — |
| Contractor condition flags | variable | Bucket cap −20 |
| Photo documentation | variable | Bucket cap −10; scoring disabled in current app |
Rounding
- Health score: clamp to 0–100 after summing deductions.
- Sand due in months:
max(0, round((interval − yearsSinceLastSand) × 12)). - Measured sandings:
floor((measured − 0.578) / 0.03125), capped by nominal remaining. - FLI remaining years:
max(0, min(pathA_years, maxLife − floorAge)). - Planning range (thin evidence): center −4 / +6 years on remaining life, never past the lifespan cap; when the sanding count is not recorded, the low end is the low end of the same floor sanded on schedule since install. Health band 45–95.
Constants used by the model that are not published standards
These are Courtside-chosen constants in the shipped model. They are scoring and planning choices, not figures from MFMA or any other publisher.
| Observation | Points | Window |
|---|---|---|
| Buckling / cupping | 8 | all history |
| Rotted / punky board | 8 | all history |
| Water damage | 7 | all history |
| Hot / humid coating conditions | 5 | all history (deduped against the HVAC risk deduction) |
| Cracked / broken boards | 4 | all history |
| Pre-existing peeling | 4 | since last sand/install |
| Recoat delamination | 4 | since last sand/install |
| Finish chipping / flaking | 3 | since last sand/install |
| Loss of sheen | 3 | since last sand/install |
| Scalloping / cup and crown | 3 | since last sand/install |
| Cover plate seating issue | 2 | all history |
| Prior repair / patch | 2 | all history |
| Rough / gritty cure | 2 | since last sand/install |
| Yellowing / ambering | 2 | since last sand/install |
| Maintenance film / residue | 2 | since last sand/install |
| Poly beads / extrusion | 1 | since last sand/install |
| Foreign material | 1 | since last sand/install |
| Marked ready to refinish | 5 | since last sand/install (contractor-reported) |
Rationale: structural and moisture observations survive a refinish; finish, wear, and process observations reset after the newest sand or install. The individual point weights were decided by Courtside Pro on July 9, 2026 as a scoring design; they are not calibrated to measured outcomes (see the decision record).
| Signal | Points |
|---|---|
| Possible water-related change | 4 |
| Board deformation | 3 |
| Finish peeling | 3 |
| Traffic wear | 2 |
| Tape damage | 2 |
| Uneven sheen | 1 |
| Yellowing | 1 |
| Finish texture issue | 1 |
| Game-line degradation | 1 |
These weights are inert: photo scoring is switched off, so every photo deduction is 0 regardless of the table above. The eligibility gates it would need once enabled — severity ≥ 3, model confidence ≥ 0.85, capture quality ≥ 0.75, analysis confidence ≥ 0.75, at least 2 corroborating photos — were decided by Courtside Pro on July 15, 2026; scoring stays off until it is enabled deliberately (see the decision record).
Sand-cycle urgency ratio thresholds: the table above names the tiers; the exact ratio is yearsSinceLastSand / sandInterval against >1.0 (overdue, −20), >0.8 (due soon, −12), >0.6 (approaching, −5). Decided by Courtside Pro on July 9, 2026; a scoring design, not a published standard.
Recoat-freshness day thresholds: exactly daysSinceService > 365 / > 270 / > 180, matching the ">1 yr / >9 mo / >6 mo" prose above. These are Courtside-chosen thresholds, not an MFMA rule.
Confirmed-service precedence: when a non-superseded confirmed-service event is on file, the effective "days since service" used for the recoat-freshness deduction is the NEWER of the contractor-reported job date and the confirmed event date — recency can only improve, never worsen, the score.
Methodology classes
Every numeric floor-intelligence rule is mapped to exactly one class in a maintained registry. Automated checks fail if a nonzero number in the model's scoring code is not registered, or is registered twice.
- Outside guidance — a figure a publisher states on a public page, cited below with its scope: MFMA's up to six sandings for 25/32" maple and its 1/32" per-sanding removal limit. Nothing else in the model is outside guidance.
- User fact — values supplied by the facility or contractor (year installed, times sanded, thickness, use, cover, HVAC, measured thickness, job history).
- Planning assumption — Courtside-owned lifecycle bounds: the 62 / 80-year lifespan caps, the 33/32" sanding count, the usage sanding intervals, the 0.578" minimum serviceable thickness, and the thin-evidence planning ranges.
- Chosen weight — Courtside-chosen scoring weights and thresholds: every deduction, bucket cap, day and ratio threshold, photo-evidence gate, risk trigger, and health-state band. These are product scoring choices with a recorded decision (below), not published standards, and not calibrated to measured floor outcomes.
- Calculated — outputs derived from the rules above (health score, remaining years, projected sand and replacement years, measured sandings). A calculated output has a formula, not a chosen value.
Decision record for planning assumptions and chosen weights
Every planning assumption, chosen weight, and publisher figure the model uses as a value has one recorded decision: its status, when Courtside Pro decided it, and why. Accepted means Courtside Pro adopted it as a scoring or planning choice, not that it is a published standard or calibrated to measured floor outcomes. Interim means a later decision replaces it once implemented. Planning assumption means a Courtside planning assumption — not a published standard — that has not yet been checked against field records.
| Rules covered | Status | Decided | Reason |
|---|---|---|---|
| Recoat overdue after 365 days; Recoat overdue deduction (exact date) −30; Recoat due after 270 days −15; and 10 more | accepted | Courtside Pro, July 9, 2026 | Courtside's v1 health-score baseline: recoat-freshness, sand-cycle-urgency and remaining-sandings tiers plus the HVAC, tape and 40-year age deductions, codified from the implementation. (The July 2026 baseline also carried a no-cover deduction; it was removed on October 12, 2026 because MFMA treats floor covers as optional.) Magnitudes are a scoring design, not calibrated to measured floor outcomes. |
| Contractor condition bucket cap −20; Buckling / cupping; Rotted / punky board; and 16 more | accepted | Courtside Pro, July 9, 2026 | Courtside's contractor condition weights by class (structural and moisture over all history; finish, wear and process since the last sand) with a −20 bucket cap. |
| January 1 dates treated as year-only records; Year-only dates anchored to July 1; Recoat overdue deduction (year-only date) −15 | accepted | Courtside Pro, July 9, 2026 | January 1 dates are year-only backfill; they anchor at July 1 and cap recoat freshness at the −15 tier. Known cost (a genuine January 1 job is treated as year-only) accepted in the record. |
| Photo documentation bucket cap −10 (scoring disabled); Photo capture quality ≥ 0.75; Photo analysis confidence ≥ 0.75; and 11 more | accepted | Courtside Pro, July 15, 2026 | A bounded photo-evidence bucket (−10 cap) with eligibility gates. Photo scoring stays switched off in the current app. The shipped gates are stricter than the original design: the strong single-photo branch (severity ≥ 4, confidence ≥ 0.90) was left out. |
| Lifespan cap 25/32"; Lifespan cap 33/32" | accepted | Courtside Pro, September 27, 2026 | Keep the 62- and 80-year planning caps. Both sit below MFMA's published typical lifespans (over 75 years for 25/32"; over 100 years "not uncommon" for 33/32"), so remaining-life projections err short. A planning cap, not a claim about how long floors last. |
| Sand interval multi-use / other (8 / 10 yr) | accepted | Courtside Pro, October 13, 2026 | A multi-use floor plans an 8-year sanding cycle and every other floor 10 years; both sit inside MFMA's 8–12-year sanding example, and the mapping to use level is Courtside's choice. A floor cover does not change the interval: MFMA's Floor Surface Protection page calls covers optional extra protection and does not claim any effect on sanding or recoat intervals, and a school's cover use is hard to know. (Until October 13, 2026 a multi-use floor recorded with a cover planned 9 years, one recorded with no cover planned 8, and one with the cover left blank planned 10.) |
| Max sandings 25/32"; Removal per sand (1/32") | accepted-interim | Courtside Pro, September 27, 2026 | Use MFMA's public figures as point values (up to six sandings for 25/32"; each sanding removes the full 1/32" limit). These are the optimistic endpoints: MFMA's "The Use of 33/32 Material" statement says a 25/32" floor "will provide four to six additional sandings after installation", and NWFA's technical VP writes that "A traditional sand job will remove 1/32” to 1/16”" (Hardwood Floors, 2025). Replaced, once implemented, by a banded remaining-sandings display decided on July 29, 2026, in which a low bound of 4 sandings at 1/16" drives phase and risk. The low bound is implemented in floor-intel-v4m-20261012 and applied to measured thickness in floor-intel-v4n-20261012 (see the banded sandings decision); the point values above stay as the high bound and still drive remaining years. |
| Max sandings 25/32" (conservative bound); Removal per sand, conservative (1/16") | accepted | Courtside Pro, July 29, 2026 | Show remaining sandings as a band from the conservative bound (1/16" per sand, 4 sandings for 25/32") to the optimistic bound (1/32", 6 sandings). The conservative bound drives phase changes, health deductions and risk badges; 33/32" keeps its single planning value because no published range exists. Remaining years still use the optimistic point values. |
| Max sandings 33/32" | planning assumption | Courtside Pro, September 27, 2026 | Courtside planning assumption — not a published standard. No current public MFMA page states a 33/32" sanding count. MFMA's earlier "The Use of 33/32 Material" statement (a maplefloor.org press release that MFMA has since removed; archived 2019 capture) says a 33/32" floor "will provide eight to ten normal sandings and has a life span of 60 years or more". The model uses the top of that range; it has not been confirmed against field records. |
| Minimum serviceable thickness 25/32" (0.578") | planning assumption | Courtside Pro, September 27, 2026 | Courtside planning assumption — not a published standard. The 0.578" minimum serviceable thickness for 25/32" maple is Courtside's own derivation from wear-layer geometry; no public source states it, and NWFA's guidelines are member publications. |
| Unknown sanding count: low end is the low end of a floor sanded on schedule since install; Unknown sanding count: a sanding on record counts as at least one | accepted | Courtside Pro, October 21, 2026 | A floor whose past sandings are not recorded is saved as not recorded instead of zero. Its remaining-life planning range is built from the low end of the same floor sanded on schedule since install (at least once when a sanding is on record); that lowers the low end only when the on-schedule estimate is the shorter one, and otherwise the range is the one the floor would already have had. The health score, phase, next sand date and deductions do not change, so an unknown never penalizes a floor. |
| Planning range never runs past the lifespan cap | accepted | Courtside Pro, October 21, 2026 | The high end of every remaining-life planning range is capped at the years left before the 62- or 80-year planning cap, so a range never shows more life than the exact estimate could. Display only; it changes no score. |
| Planning range low spread (−4 yr); Planning range high spread (+6 yr); Planning health band low (45, or 30 with no remaining life); and 7 more | accepted | Courtside Pro, September 27, 2026 | Planning ranges and health bands, phase and risk thresholds, health-state bands and the 40-year planning threshold are product scoring design, published as internal planning assumptions. Not calibrated to measured floor outcomes. |
Worked example: one floor, start to finish
This is the pinned reproducibility scenario sand-cycle-overdue, computed on August 1, 2025 by the same code the app runs. It is recomputed on every release, and the release is blocked if any number below drifts.
Inputs. Installed 2000, 25/32" maple, sanded 3 times, last sand & refinish 2014-07-01, multi-use, HVAC year-round.
- Floor age: 2025 − 2000 = 25 years. Planning life cap for 25/32": 62 years (a planning assumption; see the decision record).
- Service recency: 4049 days since the last recorded service, over the 365-day threshold with an exact date, so −30.
- Sand cycle: about 11.1 years since the last sand against an 8-year planning interval (multi-use floors plan 8 years, every other floor 10; a floor cover makes no difference), a ratio above 1.0, so −20.
- Remaining sandings: 3 used. Published guidance is a range (MFMA “four to six” sandings; NWFA 1/16″ to 1/32″ removed per sand), so Courtside Pro scores the conservative end, 4 in total, leaving 1, so −10.
- Floor cover: this example is recorded with no cover, and that changes nothing. MFMA treats covers as optional, so a missing cover is neither a deduction nor a risk, and a cover would not change the 8-year interval above.
Score. 100 − 30 − 20 − 10 = 40, clamped to 0–100. Phase: replacement_planning (one sanding left on the conservative bound). Every deduction and interval above is a Courtside chosen weight or planning assumption; its decision date and reason are in the decision record.
Sources for lifespan and sanding figures
Public pages checked on and re-checked on . No member-only or purchased publication was used.
- MFMA — Life Cycle of Flooring: a properly maintained 25/32" maple floor, sanded by a skilled contractor, can withstand up to six sandings; with sandings every 8 to 12 years the typical lifespan can exceed 75 years. Scope: conditional on maintenance, workmanship, and no environmental damage or abuse.
- MFMA — Open Letter on 33/32" Flooring: it is not uncommon for a 33/32" floor to last more than 100 years. Scope: no 33/32" sanding count and no absolute maximum is stated.
- MFMA — Sanding & Sealing: subsequent sandings by experienced contractors should remove no more than 1/32". Scope: a per-sanding limit; the model treats each sanding as removing the full 1/32".
- MFMA — Annual Maintenance/Refinishing: most gymnasium floors should be recoated annually. Courtside's 6 / 9 / 12-month recoat thresholds and their deductions are its own chosen weights, not an MFMA rule.
- MFMA — Floor Surface Protection: floor covers are not always needed in multipurpose rooms but offer extra protection. MFMA describes covers as optional extra protection for non-athletic events, not a requirement; it advises checking the finish manufacturer's cure time before covering and not leaving covers in place for extended periods. Courtside follows that position: a missing cover is not a health-score deduction or a risk. Scope: a position statement on covers; MFMA states no cover/finish compatibility requirement and no scoring rule.
- MFMA — The Use of 33/32 Material (archived 2019 capture): a properly maintained 25/32" floor "will provide four to six additional sandings after installation" with "a life span of at least 30-40 years or more"; a 33/32" floor "will provide eight to ten normal sandings and has a life span of 60 years or more". Scope: no longer on maplefloor.org; lower bounds, not maximums.
- Hardwood Floors magazine — How Many Times Can a Wood Floor Be Sanded? (April 2025): "A traditional sand job will remove 1/32” to 1/16” of actual material", and most solid wood floors "can be sanded six to eight times". Scope: a general hardwood article, not maple-gym specific.
Not supported by any public source checked: a 62-year or 80-year maximum life, a 10-sanding limit for 33/32" maple (the archived MFMA statement above gave "eight to ten normal sandings" as a typical count, not a limit), or a mapping of use levels to 8 / 10-year sanding intervals. The NWFA Technical Guidelines index points to member publications and supplies none of these numbers. These figures stay in the model as Courtside planning assumptions; the decision record gives each one's status and date, including the two that remain planning assumptions.
Floor Health Score
The Floor Health Score is a 0–100 maintenance decision-support score when required installation history is present. It applies transparent deductions for service timing, sand-cycle urgency, remaining sandings, documented risk factors, and structured contractor observations. A floor without an installation year is shown as incomplete rather than assigned a score.
- Contractor evidence: each structured condition is counted once. Structural and moisture observations remain relevant across the floor's history; finish-failure, wear, and process observations reset after the latest sand-and-refinish or installation. This bucket is capped at a 20-point deduction.
- Date precision: legacy dates stored as January 1 are treated as year-only records and anchored to July 1 for elapsed-time math. Their recoat-freshness deduction cannot exceed 15 points.
- Photo documentation: photos, stage tags, and AI findings are reviewable documentation only in the current product. They do not change the Floor Health score or product score.
Photo findings can carry purpose and stage context for review. They remain neutral to scoring in the current app, including when an analysis is pending, failed, stale, or unavailable.
Documentation boundary: a photo can preserve context for human review, but it cannot establish moisture source, active decay, repair scope, or structural safety. Contractor notes remain visible provenance and are not keyword-scored.
Manufacturer Accountability Score (MAS)
- Response Rate: 25%
- Response Speed: 20%
- Resolution Effectiveness: 25%
- Contractor Satisfaction: 15%
- Recurrence Rate: 15%
MAS is a planned weighted composite for manufacturer issue-response activity. The current manufacturer scores are illustrative demo outputs; subscriber scoring and live manufacturer issue aggregation are not active.
Confidence & Data Labels
The implementation has provenance-label concepts so users can weigh examples appropriately. Universal labels are not yet rendered on every public intelligence card:
- Real Field Data — derived from contractor job logs and structured reviews
- Public Research — drawn from public MFMA pages and the other sources linked in the lifespan and sanding sources section above; no ASBA publication or peer-reviewed study is cited
- Spec-Only — manufacturer-published specifications without field corroboration
- Pending Threshold — insufficient sample for confident publication
- Demo/Seed — illustrative data shown in demo mode only
Some product-score details display low / medium / high confidence. The current public manufacturer dashboard does not yet apply confidence tiers universally, so absence of a tier must not be read as high confidence.
Privacy & Anonymization (design target)
- A 10-company minimum (at least 10 different contractor companies behind any combined stat) is built as a design target for future aggregate views, not active subscriber output.
- Geographic and temporal bucketing are planned controls, not a claim about the current demo.
- Terms allow eligible anonymized aggregates; live manufacturer aggregation is not active.
- Records are scoped to the organization that created them.
Do not interpret the static manufacturer demo as evidence that subscriber aggregation or threshold enforcement is live.